Citizen Business Government Visitor
State of Wyoming

Region:
Road with Construction:
City or Town with Construction:
Project:
 
Text Only
 
Map
Zoom
 
Legend
Construction Zone Closure Incorportated City or Town
Numbers refer to projects listed on the right.
 
Other Construction on the Map
16 Snake River Canyon Repair Zoom To
Grading, draining, placing crushed base, and bituminous pavement surfacing, minor structural modification and miscellaneous work beginning at RM 118.32 and ending at RM 141.30 on US 26/89 between Alpine Jct. and Hoback Jct.
Scheduled Completion: 10/31/10

Road Mileposts Delays Surface
US 26, US 89 118.32 - 141.3 20 min. delays with stopped conditions. Paved

Contractor Info
  • Hout Fencing of Wyoming, Inc.
  • Worland, WY
  • (307) 347-9360
WYDOT Contact

Last Update: 6/25/10 6:47 AM
Hoback Jct Construction
25 Hoback Jct Zoom To
Reconstruction of Hoback Jct with a new bridge, retaining wall, landslide stabilization, roundabout, roadway, pathways, and park and ride.
Scheduled Completion: 10/31/12

Road Mileposts Delays Surface
US 26, US 89, US 189, US 191 140.66 - 141.76 No delays. Paved

WYDOT Contact

Last Update: 6/18/10 8:40 AM



Shaded relief derived from the National Elevation Dataset by the U.S. Geological Survey

Special thanks to the Ad Valorum Division of the Wyoming Department of Revenue for providing the Incorporated Cities and Towns.