Snake River Canyon Repair |
Zoom To |
Grading, draining, placing crushed base, and bituminous pavement surfacing, minor structural modification and miscellaneous work beginning at RM 118.32 and ending at RM 141.30 on US 26/89 between Alpine Jct. and Hoback Jct.
Scheduled Completion: 10/31/10
| Road |
Mileposts |
Delays |
Surface |
| US 26, US 89 |
118.32 - 141.3 |
20 min. delays with stopped conditions. |
Paved |
Contractor Info
- Hout Fencing of Wyoming, Inc.
- Worland, WY
- (307) 347-9360
|
WYDOT Contact
|
Last Update: 6/25/10 6:47 AM
|
|