|
|
| 45 |
Rock Springs-Rawlins (Wamsutter West) |
Zoom To |
Grading, draining, placing crushed base and bituminous pavement leveling and surfacing, bridge removal and replacement, fencing, electrical conductors, roadway lighting system, remote camera system and miscellaneous work.
Scheduled Completion: 11/30/10
| Road |
Mileposts |
Delays |
Surface |
| I 80, US 30 |
162 - 174.5 |
Reduced speeds up to 20 MPH. |
Paved |
Contractor Info
- Knife River
- Cheyenne, WY
- (307) 634-5455
|
WYDOT Contact
|
Last Update: 4/22/10 8:52 AM
|
|